Member Resources & Library

Enjoy a trusted place where you can easily find solutions. See below for a sample of our articles and resources. 

Forum Members can register or log in by clicking My Account at the top of this page to see the full range of articles. If you see a message that says an article does not exist, try logging in to view it.

If you do not have the access you expect or if you need help with your password, please email advice@theforum.social.

Case Study 2017: From push to pull: empowering local engineers at BT

Published on 27 April 2017

Case Study 2017: From push to pull: empowering local engineers at BT

See the full Case Study.

Collaboration between Operations and R&D, plus a new approach to change, put BT’s network and exchange engineers at the heart of designing new methods and technology. Moving from ‘push to pull’ decentralised most task allocation to local engineers and their ‘patch managers’, leveraging their knowledge of engineering, local exchanges and local geography. This model hugely raised engagement and will interest members in back office or field operations. Engineers are fully engaged in the development of new systems, with use of prototyping and continuous improvement methods. Productivity is up 10% in just a year. This releases Central Control to focus on high-priority, ‘jeopardy’ incidents. Sickness is down 7% and carbon emissions cut by a quarter.

Key results

  • Productivity up 10%
  • 17% reduction in travel time
  • £9m savings including £4m absorbed by outsource
  • Carbon emissions cut by a quarter
  • Mental health absence down 36%
Comments (0)Number of views (1)

Author: Leanne McNamee

Categories: Library, Awards Case Studies

Tags:

Print