2023 Customer Strategy & Planning (Virtual)

Catch up on our previous conferences. Click on the sessions below to watch the Keynotes, Workshops & Technology Showcases. Full access to these videos is part of your Forum Membership. To access these videos, register or log in by clicking My Account at the top of this page. If you do not have the access you expect please email advice@theforum.social.

Gold Sponsor
SilverPlus Sponsor
Case Study 2017: From push to pull: empowering local engineers at BT

Published on 27 April 2017

Case Study 2017: From push to pull: empowering local engineers at BT

See the full Case Study.

Collaboration between Operations and R&D, plus a new approach to change, put BT’s network and exchange engineers at the heart of designing new methods and technology. Moving from ‘push to pull’ decentralised most task allocation to local engineers and their ‘patch managers’, leveraging their knowledge of engineering, local exchanges and local geography. This model hugely raised engagement and will interest members in back office or field operations. Engineers are fully engaged in the development of new systems, with use of prototyping and continuous improvement methods. Productivity is up 10% in just a year. This releases Central Control to focus on high-priority, ‘jeopardy’ incidents. Sickness is down 7% and carbon emissions cut by a quarter.

Key results

  • Productivity up 10%
  • 17% reduction in travel time
  • £9m savings including £4m absorbed by outsource
  • Carbon emissions cut by a quarter
  • Mental health absence down 36%
Comments (0)Number of views (69)

Author: Leanne McNamee

Categories: Library, Awards Case Studies

Tags:

Print