Scheduling & Wellbeing Modules

Scheduling is much more than creating shifts, so we have designed a series of webinars to explore the opportunities in developing the right flexibility strategy for your business.

2026 Team Awards Case Study: Embedding Control, Clarity and Proactive Governance at TSB Bank

Published on 04 September 2026

2026 Team Awards Case Study: Embedding Control, Clarity and Proactive Governance at TSB Bank

Establishing a common framework
At the close of 2024, workforce planning at TSB was operating through a series of models that had evolved over time. While they delivered outputs, documentation and controls varied, and assumptions were not always consistently captured. The team chose to address this through structure rather than incremental adjustment. A standardised framework was introduced across all capacity models. Each model now opens with a team summary tab, clearly setting out operational ownership and key stakeholders. An assumption log records modelling choices in a transparent and accessible way, and a formal change log tracks every update to ensure full auditability. This approach has created clarity at the point of use. Analysts retain autonomy in how they build and manage models, but within a consistent structure that protects integrity. Rework has reduced, handovers are smoother, and the risk of misinterpretation has materially lowered because every model now tells its own story.

Read More 

Comments (0)Number of views (3)

Author: Leanne McNamee

Categories: Library, Awards Case Studies

Tags:

Print